Skip to content

Metro – (Central Kitchen)

Agri-Food Construction

Prepared meals plant for Adonis markets

Context

This large-scale project consisted of designing and building a brand new “Central Kitchen” type plant for Metro Richelieu Inc. (Adonis markets). The company needed new infrastructure to produce prepared meals, intended in particular for the bakery, pastry and meat departments of its supermarkets.

In addition to the various production areas designed to meet the strictest regulatory standards and requirements, the building includes raw material (frozen, refrigerated and dry) and finished product warehouses.

Service Type: Construction Management

Size: 45,000 sq. ft.

VIRT6998-Panorama-Edit_v2-scaled

What sets us apart

As part of this project, the FRARE GALLANT team participated in the design and value engineering sessions, was able to design a plant that meets the most stringent agri-food hygiene standards and completed the project within a tight schedule.

VIRT6948-Panorama-Edit-scaled VIRT7218-Panorama-scaled VIRT7368-Panorama-scaled VIRT7193-Panorama-scaled VIRT7003-Panorama-scaled VIRT6968-Panorama-Edit-scaled VIRT6963-Panorama-scaled VIRT6978-Panorama-scaled VIRT7203-Panorama-scaled VIRT7318-Panorama-scaled

Share this project

Contact Us

Whether you have a construction project in mind, questions about our services, or simply want to learn more about what we can do for you, we will get back to you as soon as possible.

DSC05823@2x
3 (1)@2x

"*" indicates required fields

Reason for your contact*
Max. file size: 16 MB.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.